Kent
The entrance stairway and reception rooms of this timber framed, period property were totally restored and refurbished. Careful renovations and decorating were needed to achieve this high level look.
In conjunction with Bridget Reading ID
Photography: Chris Snook of Snook Photography
Project summary
All walls and ceilings were over boarded and plastered.
The original timber beams and window frames were stripped and renovated.
Damp proofing works to the concrete floors was necessary.
New lighting and AV system
Co-ordination with subcontractors
07791 532 526
[email protected]
Danube Construction Limited
1, Earl Street,
Northampton
NN1 3AU